We build and attach the Right Shoulder Joint in Issue 78!
Tag Archives: top
Issue 77
In Issue 77, we will construct the Arm Base that will support the arm joints!
Issue 76
In the same way, we connect the Left Shoulder Plate to the Chest Structure with Issue 76!
Issue 75
The Right Shoulder Plate is attached to the Chest Structure during Issue 75!
Issue 74
We attach the Breastplate Mechanism to our Chest Structure in Issue 74!
Issue 73
In Issue 73, the Breastplate and Neck Armor are installed and we finish the ‘work’ Base!
Issue 72
We install the ARC Reactor Holder to our Chest Structure and continue more Base assembly during Issue 72!
Issue 71
The Ball Joints of the hips are assembled and work begins on the small ‘work’ Base with Issue 71!
Issue 70
All of parts from the previous four issues come together as we complete the pelvic section in Issue 70!
Issue 69
We quickly build the Left Hip Plate supplied with Issue 69!